Construction
The North Plant is composed of the following facilities:

An open pit mine (operating capacity 5 mtpa) and a mineral preparation facility (3 mtpa)

Access road to mine (12km) and conveyor (11km in 2 sections)

Metallurgical plant: rate of supply in minerals 3mtpa for a ferronickel production of 176,000tpa (60,000tpa of nickel metal content)

Power station:
  • Main units: 2 coal boilers and steam turbines at 135MW each
  • Backup units: 2 diesel combustion turbines at 40MW each
Port facilities: an access fairway of 4.5km (13m water draught) and a 190m long quay capable of accommodating boats up to 50 0000 DWT

Coal supplying facility (1 mtpa)

Desalination facilities(water supply)

Terrestrial waste storage plants, on the Vavouto peninsula
Construction Schedule